Dealer Login
  • Türkçe
  • English
  • العربية
  • French
  • Pусский
  • Select a pump model which has performance values (pressure, flow) adequate to usage purpose (gear,pump, piston pum, ben axis pump)
  • Determine adequate connection flange type (UNI,ISO, Shaft,etc)
  • Choose pump rotation according to the rotation of stimulating components as PTO, electric motor.
  • Notice tahat while mounting pump to smilating components (elektric motor, PTO, etc.) it shouldn't be swanky, nuts should be tightened completely and balanced, hoses connections should be flexible.
  • Pull out plastic plugs on oil inlet and outlet holes after mounting the pump and mount fittings immediately.
  • Check cleanliness and flexibility oil tank, filters and the system. Air inlet and outlet of oil tank should be flexible.
  • Check that all the system is filled whit oil till pump inlet and all the valves are open, do not run pump without oil even a few seconds.
  • First operation should be for a few minutes without pressure and with low circuit and check whether pump is working normally, its noise level and oil leakes. When an abnormal condition is aroused, stop system and check for faults.
  • Oil emptying hole shown on Figure is designed to understand the failures and leaks on oil seals. Operator should check oil emptying hole frequently.
  • After first operation system will fill with oil tank level should be checked again and add decreasing oil to oil tank.
  • While operating pump normally, do not extend maximum circuit values mentioned in catalogue.
  • Do not pass pressure valves pressure adjustments while they are adjusted during production with sensitive measurement tools.
  • Do not change valves pressure adjustments while they are adjusted during production with sensetive measurement tools.
  • Ideal oil temperature is betweent 500-600. Pump can run between 00-80.
  • Do not neglect periodical attentions of systems although it runs normally. (Oil aqulity, filer cleaninliness, visual controls,...etc...)
  • Contact with service department on probable problems.